Barrow Hill Relay and Generator Room

Date: January 2014

Our Rail Division was appointed by Colt Construction to carry out the installation of a new roof covering to the Relay and Generator Rooms.  Project Value - £37,000.00

Project Background

Everlast Group was appointed to carry out roofing works to this existing building.

  • The existing roof was stripped down to the deck
  • Everlast installed insulation fully adhered to the existing deck and Tremco built-up felt
  • The following works were also included in the roofing package:
    • Scaffold access and Scaffold design

Client Benefits

Regular management attendance on site ensured that the project was delivered with Zero snagging.

  • 20 year material and workmanship Guarantee.
  • System installed that requires minimal maintenance and has a life expectancy of over 50 years.
  • Full comprehensive Operation & Maintenance file provided upon completion of works.
  • Project delivered on programme and to budget.